Construcción de la ruta 2 (Km66) Aguaity - Tobatí, modalidad llave en mano

Client: MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS. Period: 2019 – 2020. Main works executed (in two sections) Section length: 24,20 Km. Final engineering design. Soil Movement. Works of Earth and drainage. Reinforced concrete bridges. Horizontal and vertical signage.

Construcción de puentes de hormigón armado y metálico en varios departamentos del país

Client: Ministry of Public Works and communications. Period: 2017 – 2018. Main jobs executed: Construction of 12 bridges, at the departments of Concepción, Amambay, and San Pedro. Variable length – between 6 to 30 m. Installation and assembly of metal structures.. Complementary works.

Construcción Laguna Crystal - Hernandarias

Client: Ministry of Public Works and communications. Period: 2016 – 2017. Main works executed (in two sections): Length Bridge: 120m. Manufacture of reinforced concrete stirrups. Pillars and cross beams in prefabricated concrete. Installation and assembly of metal structures. Gabions. Complementary works.

Rehabilitación de caminos rurales - departamentos San Pedro, Caaguazu y Caazapa

Client: Ministry of public works and communications. Period: 2017 – 2018. Main works executed (in two sections): Section length: 39 Km. Stone pavement Construction. Road improvement with gravelling. Concrete sewer. Vertical signaling.

Rehabilitación y Pavimentación del Tramo: Caaguazú - Vaqueria (Tramo I y II)

Client: Ministry of Public Works and communications. Period: 2012 – 2014. Main works executed (in two sections): Section Length: 64 km. Embankment. Reinforced concrete bridges – Length: 220.00 Ml. Asphalt irrigation. Horizontal and vertical Signaling. Concrete sidewalk curbs.

Rehabilitación y Pavimentación: Ruta 10 “Residentas” - Puerto Rosario - San Estanislao - Tramo II

Client: Ministry of Public Works and communications. Period: 2009 – 2011. Main jobs executed: Length of the section: 37 km. Embankment. Soil Base Added. Aggregate soil Sub Base. Asphalted Concrete. Soil cement. Reinforced concrete Bridges – Length: 60.00 ML. Horizontal y vertical Signaling. Concrete sidewalk curbs.

Recubrimiento de la ruta N º 5 “Gral. Bernardino Caballero ”, tramo: Yby Yau - Km. 179

Client: Ministry of Public Works and communications. Period: 2008-2010. Main jobs executed: Length of the section: 45 km. Asphalted Concrete. Asphalt irrigation. Street patching. Horizontal and vertical signaling. Concrete sidewalk bord.

Pedro Juan Caballero: Pavimento asfáltico en calles de la ciudad

Client: Municipality of PEDRO JUAN CABALLERO. Periods: 2009-2010/2013-2014/2015/2016. Main jobs executed: Recoating: 700,000 m2 urban streets. Asphalted access of the City Bus Terminal. Vertical and horizontal Signaling. Concrete sidewalks curbs.

Pavimentación asfáltica de tramos Interurbanos en Depto.Central - Lote 2

Client: Ministry of Public Works and communications. Period: 2017 -2018. Main jobs executed: Section Length 50 Km. Regularization and asphalt paving. Sewer and Drainage Works. Signaling.

Vías pavimentadas de piedra en varios tramos de la Región Oriental Obra 3: Tramo Horqueta - Río Ypane

Client: Ministry of Public Works and communications. Period: 2013-2015. Main jobs executed: Section: length 39 km. Embankment – 450,000 M3. Bridges-In several sections (total length 80ml). Sewer and Drainage Works. Vertical Signaling.

Tratamiento costero en el margen derecho - Paquete “B

Client: YACYRETA Binational Entity. Period: 2007 – 2013. Main jobs executed. Coastal Defense Filler (21.6 km). Slope Defense. Causeway. Stone base. Asphalt Paving. Storm drains and sewers. Urban works: sidewalks, bicycle-trails, Park Areas, railings. Civil works at the “Sambadrome”. Sanitary Landfill and grading plant.

Contrato de Rehabilitación y Mantenimiento de Carreteras para Índices de Servicio (CREMA): Ruta Nacional No. 3 - Limpio - Arroyos y Esteros - San Estanislao - Rotonda Arroyo Tapiracuaty - Rotonda Calle 6000 S (148.5km)

Client: MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS (MOPC). Period: 2015 to 2022. Main works executed: Asphalt resurfaced – extension: 147 km. New asphalt plant installation: production 15,000 tn/month. Railing Installations. New signaling. Embankment expansion at flood areas. Section maintenance. Enabling roundabout access to Juan de Mena.