Client: National Electricity Administration (ANDE).
Period: 2015 – 2017.

  • Expansion of substations Acaray And President Franco.
  • Supply, design and construction needed, in order to adapt the 220 KV patios.
  • Interconection through new transmission line 2 x 220 KV between them.