Client: Ministry of Public Works and communications.
Period: 2016 – 2017.
Main works executed (in two sections):

  • Length Bridge: 120m.
  • Manufacture of reinforced concrete stirrups. Pillars and cross beams in prefabricated concrete.
  • Installation and assembly of metal structures.
  • Gabions.
  • Complementary works.