Client: Ministry of Public Works and communications.
Period: 2012 – 2014.
Main works executed (in two sections):

  • Section Length: 64 km.
  • Embankment.
  • Reinforced concrete bridges – Length: 220.00 Ml.
  • Asphalt irrigation.
  • Horizontal and vertical Signaling.
  • Concrete sidewalk curbs.