Client: MINISTRY OF PUBLIC WORKS AND COMMUNICATIONS.
Period: 2018-2022 (In Progress).
Main jobs executed:

  • Total, length: 42km.
  • 377,000 m3 sand fill.
  • 1.250.000 m3 conventional embankment.
  • 28.300 m3 asphalt concrete with polymer.
  • 90.000m3 stabilized granular base and 100,000 m3 stone floor.
  • 7 bridges, of which the most important one has 1,175 m.
  • Due date: February 2022.